March 19, 2008
At this time, we are waiting for a survey of the site to mark the area that
the trees are to be cut. We will get a permit for the stump and tree
removal. There are six contractors interested in removing the stumps and
trees. Karen Gray has agreed to be the official photographer, so be watching
for her photos on this website. The Construction Team has been charged with
the task of designing a maintenance building that matches the exterior of
the church and has a shop included. The Team is also going to be designing
the classroom area which is in the lower level of the church.
Construction Team Reports
